The mitigation and monitoring plan should embrace performance-based mitigation measures and specific triggers for their implementation. While preserving in mind the considerations raised by the Ontario Ministry of the Environment and Climate Change, the Agency is of the view that measures described within the Report could be effective in ensuring that modifications to water quality in Neville Lake usually are not likely to trigger a significant opposed environmental impact on fish and fish habitat. The Agency is happy with the proponent's commitment to monitor the presence of wildlife incidents and dangers to wildlife inside the project footprint by way of all project phases, and to determine a monitoring program in collaboration with Aboriginal land customers (e.g. that hunt wildlife) as applicable.

Controls to access will continue to be in place through the operation section; nevertheless, the proponent doesn't predict this to limit the flexibility to navigate by way of the area. As a health precaution, navigation by way of areas where air high quality exceedances may happen shall be restricted to 24-hours or much less and 4 campsites will be removed. In addition, some customers could avoid the traditional and 4M Circle Canoe routes due to the aesthetic changes to the panorama attributable to the mine rock space and tailings management facility. During the operation section, watercourse realignments and entry controls from the construction section would stay in place. In addition, travel through areas where air quality exceedances could happen shall be restricted to brief time period visits (i.e. less than 24-hours). Overnight camping will no longer be permissible alongside the routes so as to protect human well being.

The proponent anticipates that the common concentrations of a number of metals and ions will exceed baseline levels in water our bodies near the Project, however does not expect adverse results to fish from these exceedances. Consumption of fish in these water bodies isn't predicted to end in results to human well being. [newline]During the construction section and the early years of the operation phase , noise and vibration from blasting in the open pit (as described in Section 6.3) might have an result on the quality and use of fish habitat in the southern basin of Clam Lake nearest to the open pit, thereby lowering the spawning success by resident fish. However, smallmouth bass is the dominant fish species in this water physique, and there's an abundance of spawning habitat for this species alongside the west and north shore of Clam Lake. Direct effects on individual fish are not anticipated and effects associated to spawning habitat are predicted to be minimal.

The proponent has committed to growing an offsetting plan for serious hurt to fish that uses a pure channel design approach which is predicted to offer top quality habitat for both fish and non-fish species. Implement an offsetting plan for any critical harm to fish, and a fish habitat compensation plan utilizing a natural channel design that mimics natural circulate and flooding patterns and incorporates shoreline and riparian vegetation. No vegetation with particular conservation standing have been reported or discovered within the terrestrial biology regional examine space. Therefore, adverse results to vegetation of particular conservation standing which are linked to federal choices usually are not predicted and weren't assessed further. The Agency acknowledges that the proponent doesn't have a timeline for project building. The Agency recommends, for consideration within the Minister's Decision Statement, that the proponent use finest available data and knowledge, including group and Aboriginal traditional knowledge, throughout all phases of the Project.

Depending on the dimensions and scope of the failure, take action to minimize back the magnitude and extent of the environmental effects, and remediate affected areas as applicable. Conduct development activities underneath acceptable supervision and using applicable materials, and implement high quality assurance and high quality control measures. Use deterrents and deflectors on transmission strains throughout all project phases to scale back the chance of mortality to bats because of potential electrocution.

The Agency and federal authorities have thought of the proponent's water quality evaluation methodologies and potential changes to water quality in the context of effects on fish and fish habitat. The Agency acknowledges that the proponent has committed to recycling mine water in a fashion that would reduce the frequency and duration of effluent discharge. The Agency sought clarification from Aboriginal groups in the course of the course of the environmental evaluation on potential results to current use of lands and assets for conventional functions to validate the knowledge introduced by the proponent. Furthermore, the Agency required the proponent to consider any info supplied by Aboriginal groups throughout all phases of the environmental evaluation course of in its results evaluation. Conditions related to key mitigation measures that handle environmental effects on Aboriginal peoples would additionally support mitigation and lodging of potential impacts on potential or established Aboriginal or treaty rights. Cumulative effects on present use of lands and sources for traditional Aboriginal purposes, together with plant harvesting, looking, trapping, and navigation routes utilized by Aboriginal peoples, may happen in combination with results caused by forestry actions.